shutdown retrofits and phased production work

Install pages must make the shutdown plan visible before the bid is signed.

For active plants, Sonic Air turns shop-fab duct, lifts, roof work, rigging, safety permits, and punch-list closeout into a staged installation board.

W1

shop fabricate

W2

rigging route

W3

crew window

W4

plant lockout

W5

punch list

proof packet

Install proof is spool tags, lift plans, permits, and punch photos.

spool tags

lift plan

safety permit

closeout photo

Send shutdown window, rigging limits, and safety requirements.

Plan shutdown